A room can look and feel dry to the touch while moisture meters still show trapped moisture inside wall cavities or under flooring.
Our Sunset, UT drying plans start with thermal imaging to map exactly where moisture is hiding.

Every Structural Drying And Dehumidification job in Sunset, UT starts with psychrometric calculations that determine exactly how much airflow and dehumidification capacity is needed.
LGR capacity is standard equipment on every Structural Drying And Dehumidification job, not a premium upgrade.
We map hidden moisture with thermal imaging before finalizing equipment placement.
You receive documented daily readings showing the structure actually getting drier.
Below is the calculated, documented process our Sunset, UT teams follow.

We calculate temperature, humidity, and grain depression readings to build the drying plan.
Thermal imaging often reveals moisture has traveled further than the visible damage suggested.
Dehumidifier capacity is matched to the calculated moisture load for that specific space.
Documented logs track the numbers from day one through final verification.
Specialty drying protocols protect materials that standard drying speed could damage.
We provide a written verification report confirming the structure has reached dry standard.
A quick call helps us determine whether thermal imaging and full drying equipment are needed.
Our nearest Sunset, UT crew brings diagnostic equipment loaded from the start.
You'll see the calculated plan and cost before drying equipment goes down.
A written verification report backs the final sign-off.

"The thermal imaging found moisture behind a wall that looked completely fine from the outside. Would have missed it otherwise." — Julian R.
"They came back every single day to take readings and showed me the numbers improving. Felt like real science, not guesswork." — Monique T.
"Our hardwood floor didn't warp because they slowed the drying process down specifically for it." — Grant P.
We rely on moisture meters and thermal imaging, not appearance alone.
Psychrometrics uses scientific formulas to size the drying plan to the actual moisture load.
Timeline depends on material type and how much moisture the thermal scan revealed.
Daily documentation is standard, giving you real data rather than just an assurance.
Specialty drying protocols protect hardwood and cabinetry from the damage a standard drying speed could cause.
A stall in the daily logs triggers a plan review rather than simply leaving equipment running unchanged.
If your property is in or near Sunset, a crew can typically respond the same day.

Speak directly with our structural drying team.
Call +1-844-833-1325